UPAYA MENAIKKAN PRODUKTIVITAS TENAGA KERJA PADA PROGRAM PEMELIHARAAN DI PG KREBET BARU II
Saved in:
Main Author: | Hardjanto Nusantoro |
---|---|
Format: | TEXT |
Language: | Indonesia |
Published: |
MM-SP-UGM
1989
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
DATA AREAL, PRODUKSI, PRODUKTIVITAS PER PERUSAHAAN GULA DAN PG DI INDONESIA 1998-2003
by: SEKRETARIAT DEWAN GULA INDONESIA
Published: () -
Pabrikasi Gula Untuk Kursus Masinis III P.G.
by: Soejardi
Published: (1973) -
OPTIMALISASI PENDAYAGUNAAN FAKTOR PRODUKSI BAHAN BAKU DI PG KREBET BARU MALANG
by: I Nyoman ArsanaInsiwijati P.
Published: (1990) -
System dan perencanaan mekanisasi tanaman tebu untuk proyek pabrik gula baru tahap 1
by: Kartohadikoesoemo, Noerman
Published: (1985) -
AZAS-AZAS TEKNIK PABRIKASI GULA : KEBUTUHAN PANAS DI PABRIK GULA
by: Sumarno
Published: (1971)