Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath
Bewaard in:
Hoofdauteur: | |
---|---|
Formaat: | Umum |
Taal: | Asing |
Gepubliceerd in: |
Prentice-Hall Inc,
1969
|
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
id |
oai:lib.uajy.ac.id:0000005185 |
---|---|
record_format |
oai_dc |
spelling |
oai:lib.uajy.ac.id:00000051851999-12-28 07:45:20.000Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. HeathRIGGS, James L.Prentice-Hall Inc,1969Umum220 p. ill., 29 cm625.7 RIG gAsinghttps://siquest.uajy.ac.id/description/0000005185 |
institution |
Universitas Atma Jaya Yogyakarta |
collection |
Perpustakaan Yogyakarta |
language |
Asing |
description |
|
format |
Umum |
author |
RIGGS, James L. |
spellingShingle |
RIGGS, James L. Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath |
author_facet |
RIGGS, James L. |
author_sort |
RIGGS, James L. |
title |
Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath |
title_short |
Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath |
title_full |
Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath |
title_fullStr |
Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath |
title_full_unstemmed |
Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath |
title_sort |
guide to cost reduction thrugh critical path scheduling james l. riggs and charles o. heath |
physical |
220 p. ill., 29 cm |
publisher |
Prentice-Hall Inc, |
publishDate |
1969 |
callnumber-raw |
625.7 RIG g |
callnumber-search |
625.7 RIG g |
_version_ |
1740830758202769408 |