Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath

Saved in:
书目详细资料
主要作者: RIGGS, James L.
格式: Umum
语言:Asing
出版: Prentice-Hall Inc, 1969
标签: 添加标签
没有标签, 成为第一个标记此记录!
PINJAM
id oai:lib.uajy.ac.id:0000005185
record_format oai_dc
spelling oai:lib.uajy.ac.id:00000051851999-12-28 07:45:20.000Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. HeathRIGGS, James L.Prentice-Hall Inc,1969Umum220 p. ill., 29 cm625.7 RIG gAsinghttps://siquest.uajy.ac.id/description/0000005185
institution Universitas Atma Jaya Yogyakarta
collection Perpustakaan Yogyakarta
language Asing
description
format Umum
author RIGGS, James L.
spellingShingle RIGGS, James L.
Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath
author_facet RIGGS, James L.
author_sort RIGGS, James L.
title Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath
title_short Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath
title_full Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath
title_fullStr Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath
title_full_unstemmed Guide To Cost Reduction Thrugh Critical Path Scheduling James L. Riggs And Charles O. Heath
title_sort guide to cost reduction thrugh critical path scheduling james l. riggs and charles o. heath
physical 220 p. ill., 29 cm
publisher Prentice-Hall Inc,
publishDate 1969
callnumber-raw 625.7 RIG g
callnumber-search 625.7 RIG g
_version_ 1740830758202769408