Penjadwalan Satu Mesin Untuk Meminimalkan Rata-rata Keterlambatan Mengunakan Algoritma Moore
Saved in:
Main Author: | Chandra Dewi |
---|---|
Format: | Referensi |
Language: | Indonesia |
Published: |
s.n.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Penerapan sistem penjadwalan untuk meminimasi rata rata flowtime dan rata rata keterlambatan (Tardiness) di PD Tarumartani
by: Masrikhah
Published: (2018) -
RATA-RATA UPAH PEKERJA PERKEBUNAN
by: Biro Pusat Statistik.
Published: (1980) -
Jangan Mau Jadi Siswa Rata-rata
by: Rudianto
Published: (2018) -
CURAH HUJAN RATA-RATA DI JAWA & MADURA
by: Lembaga Meteorologi & Geofisika Dep. Perhubungan R.I..
Published: (1969) -
Metode pengujian tebal dan panjang rata-rata agregat
Published: (1993)