Evalusai Alternatif Lokasi Base Transceiver Station (BTS) Menggunakan AHP (Analytic Hierarchy Proses)
v, 40 hlm.
Saved in:
Main Author: | Subiyantoro, Cuk |
---|---|
Language: | Indonesian |
Published: |
STMIK AKAKOM
2008
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
SISTEM PENDUKUNG KEPUTUSAN UNTUK PEMILIHAN LOKASI PEMBANGUNAN BTS (BASE TRANSCEIVER STATION) TELKOMSEL DI PT WITHUS INDONESIA DENGAN METODE AHP
by: Cuk Subiyantoro, et al.
Published: (2008) -
APLIKASI PEMETAAN BASE TRANSCEIVER STATION KABUPATEN SLEMAN
by: Badiyanto, et al.
Published: (2014) -
Perencanaan base transceiver station untuk perluasan jaringan GSM
by: Arifuddin Hidayat
Published: (2003) -
Evalusai Pembelajaran
by: Zainal Arifin
Published: (2011) -
Ahp (the Analytic Hierarchy Procee) Bambang Permadi
by: Permadi, Bambang
Published: (1992)