Skip to content
Your Account
Log Out
Login
Language
English
Deutsch
Español
Français
Italiano
日本語
Nederlands
Português
Português (Brasil)
中文(简体)
中文(繁體)
Türkçe
עברית
Gaeilge
Cymraeg
Ελληνικά
Català
Euskara
Русский
Čeština
Suomi
Svenska
polski
Dansk
slovenščina
اللغة العربية
বাংলা
Galego
Tiếng Việt
Hrvatski
हिंदी
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Tag
Find
Advanced
Perhitungan cadangan batubara...
Cite this
Text this
Email this
Print
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Save to List
Permanent link
Perhitungan cadangan batubara dengan metode cross section profilling lapisan A-13 dan A-14 blok 28
Saved in:
Bibliographic Details
Main Author:
29-38-39 pada KW 96PP0430 PT. Bukit Baiduri Enterprise Merandai, Kab. Kutai, Kalimantan Timur / Seti
Format:
TEXT
Published:
STTNAS
1999
Tags:
Add Tag
No Tags, Be the first to tag this record!
PINJAM
Holdings
Description
Comments
Similar Items
Staff View
Be the first to leave a comment!
Your Comment
You must be logged in first
Similar Items
Perhitungan cadangan batubara berdasarkan metode sayatn dan metode luas area pada lapisan TDC1 dan T
by: 11 phase 1 pada PIT Jongkang East/South East PT. Bukit Baiduri Snterprise Merandai Kab. Kutai Kalima
Published: (2000)
Estimasi kuantitas dan kualitas batubara dengan metode cross section pada PIT Galaxy phase X-XII blo
by: 51-61/62 KW 96PP0430 PT. Bukit Baiduri Enterprise Kalimantan Timur / Sudiatmono
Published: (1999)
Perhitungan cadangan batubara batas penambangan dengan metode cross section profilling lapisan TDC4
by: M Syarifuddin
Published: (1999)
Perhitungan Cadangan Batubara Least-Squares Curve Fitting
by: Indun Titisariwati
Published: (1995)
Evaluasi Cadangan Batubara Di Daerah Simpang Empat, Banjar, Kalimantan Selatan
by: Nusanto, Gunawan
Published: (2000)
Loading...