Skip to content
Your Account
Log Out
Login
Language
English
Deutsch
Español
Français
Italiano
日本語
Nederlands
Português
Português (Brasil)
中文(简体)
中文(繁體)
Türkçe
עברית
Gaeilge
Cymraeg
Ελληνικά
Català
Euskara
Русский
Čeština
Suomi
Svenska
polski
Dansk
slovenščina
اللغة العربية
বাংলা
Galego
Tiếng Việt
Hrvatski
हिंदी
All Fields
Title
Author
Subject
Call Number
ISBN/ISSN
Tag
Find
Advanced
Perhitungan saturasi fluida be...
Cite this
Text this
Email this
Print
Export Record
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Save to List
Permanent link
Perhitungan saturasi fluida berdasarkan analisa log pada sumur "X" struktur "Y" Pertamina operasi pr
Saved in:
Bibliographic Details
Main Author:
Andy Adhari
Format:
TEXT
Published:
STTNAS
1999
Tags:
Add Tag
No Tags, Be the first to tag this record!
PINJAM
Holdings
Description
Comments
Similar Items
Staff View
Similar Items
Kajian Lingkungan Pengendapan Dari Data Wire Line Log Sumur X
by: HUNTORO
Published: (1995)
Perhitungan volumetris cadangan minyak pada zona "X", "Y", "Z" struktur Sungai Buluh Pertamina OP EP
by: Ruslinsyah
Published: (2000)
Analisa kandungan serpih dan saturasi hidrokarbon pada sumur STTNAS formasi rayung lapangan minyak K
by: Rhis Eka Wibawa
Published: (1999)
Analisa Hidrolika proses penyemenan dua tingkat pipa selubung produksi "7" pada sumur pegaden X Lapangan Pertamina Operasi Karangampel
by: Suwardiyono
Published: (2000)
Analisa hidrolika proses penyemenan dua tingkat pipa selubung produksi "7" pada sumur pegaden X lapangan pertamina operasi karangampel
by: Suwardiyono
Published: (2000)
Loading...