Perencanaan produksi All New Datsun Go dan Go+ Panca dengan pendekatan time series dan double exponential smoothing di PT. Nissan Motor Indonesia ( Kawasan Industri Kota Bukit Indah Blok A-III Lot. 1-14, Purwakarta )
wt,1/nis,c.1
Saved in:
Main Author: | Syaiful Amilin |
---|---|
Format: | Skripsi |
Language: | Indonesia |
Published: |
Fak. Sains dan Teknologi UIN Sunan Kalijaga
2016
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analisis perbandingan peramalan metode exponential smooting dengan moving average dan regresi linear pada PC. GKBI
by: Muhammad Lukman Alrayid
Published: (2018) -
Elementary Double-Bass Method
by: ZIMMERMAN, O.G
Published: (1939) -
Sonata Double Bass And Piano
by: Hindemith, Paul
Published: (1950) -
Melodius Double-stops = Melodies en Double-cordes
by: TRORR, Josephine
Published: (1931) -
Concerto for the double bass
by: CAPUZZI, Antonio, et al.
Published: (1938)