Job shob schedulling menggunakan metode algoritma active schedule generation, non - delay schedule generation dan heuristic schedule generation ( studi kasus di PT.Multi Citra Busana Blitar, Jawa Timur )

wt,1/IRH,C.1

Saved in:
Bibliographic Details
Main Author: M. Arul Zaini
Format: Skripsi
Language:Indonesia
Published: Fak. Sains dan Teknologi UIN Sunan Kalijaga 2019
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
PINJAM
Description
Summary:wt,1/IRH,C.1
Physical Description:xxii, 171; 24